4th May 2011
Question: Councillor M. Baker:
To ask the Manager to have the footpath outside (details supplied) repaired following the works done by the ESB when large vehicles associated with the works damaged the pathway?
Reply:
The Roads Control Unit monitored the ESB works in this area and it is satisfied that the damage to the footpath at this location was not caused by the ESB works or the parking of their vehicles associated with the works. The Road Maintenance Section will be doing some footpath repairs in this general area during the summer period and the footpath described here will be repaired in conjunction with these works.