Question: Councillor M. Baker
“To ask the Chief Executive to add the following to the works list for Bath Place,
Blackrock:
1. Repair the granite kerbing on the edge of the pathway by the area near the
trees and benches (seaward side near Idrone Terrace).
2. Replace the broken silver bollard beside the car park (on the pathway).
Please advise when these works will take place?”
Reply:
The loose/detached granite kerbstones at this location will be reset. The dented
silver stainless steel bollard will be replaced when work is being carried out on the
kerbstones.
The work in both cases will be completed by end of June 2016.