Question: Councillor M. Baker
“To ask the Chief Executive to arrange repair of the footpath outside (details
supplied) after recent works as it is currently a trip hazard?”
Reply:
An excavation was carried out on the footpath at the location described to facilitate
repairs to the water supply network. On completion of the repair to the water supply,
a temporary re-instatement was carried out. Following the receipt of notification
about the unsatisfactory condition of the temporary reinstatement, arrangements
were made for it to be permanently reinstated. This work is now completed
satisfactorily.
Path Reinstatement
Meeting of the Dun Laoghaire Area Committee
Written: 9 years ago