Proby Sq. road surface

Dun Laoghaire Area Meeting

Written:

Question: Councillor M. Baker
“To ask the Chief Executive when the pot holed road surface on Proby Square will be repaired given that the adjacent footpath was repaired in 2020? The location in question is at the junction with Carysfort Avenue beside the Carysfort Clinic. The surface is so poor that several trip hazards exist and this is a route to the nearby doctors clinic.”
Reply:
The road in Proby Square will be resurfaced in the first half of 2021, subject to the lifting of the Covid19 restrictions on construction.