That the Chief Executive replaces the footpath outside (junction with George’s Avenue) as it becomes
inundated with water during heavy rain and as such is unusable for pedestrians. The nearby
gulley has been checked and is operational. The flooding issue seems to be as a result of a
footpath build out at the nearby junction.
Report:
To reduce the flooding at this location, a new gully will be added. This will be added to the
gully repair programme with works to be completed by the end of the year.
Frascati Park path
Written: 1 week ago